Author: Peter Major

Temporary traffic lights on Wembdon Rise 28th February to 1st March

Temporary traffic lights sign

We have just heard that there will be temporary traffic lights from Wednesday 28th February to Friday 1st March on Wembdon Rise, between Inwood Road and Wares Lane. This is to allow Wessex Water to carry out “Utility Repair and Maintenance Works”. A pedestrian walkway will be provided through the works.

For further information about the work, you can contact Wessex Water on 0345 600 4 600.

One of our parishioners has complained to the Parish Council that an advance warning sign placed next to the pedestrian crossing potentially obscures children waiting to cross. A Parish Councillor has phoned Wessex Water about this, and is expecting them to reposition the sign today.

Reminder: Closure of Sandford Hill – 12th February

A Road Closed sign

The section of Sandford Hill between Skimmerton Lane and Sandford Farm Approach will be closed on Monday 12th February 2024. The closure will start at 09:30 and is expected to last until 15:30 at the latest, to allow Openreach to replace a telegraph pole.

Residents in the affected section should still be able to access their properties.

The official notice for the closure states that for for further information you should contact Sunbelt Rentals on 03700 500 792 quoting reference ttro540539N.

Roadworks about to start on A39 Quantock Road

The works to construct the road junctions for the Cokerhurst Farm development are finally expected to start next week. The consultants for the project told Wembdon Parish Council this week:

“After a slight delay, we are now in a position to commence the works at Cokerhurst Farm. The official start date is Monday 12th February, however you may see some enabling activities this week; including delivery of plant and welfare equipment. Traffic management will be placed on the A39 from next week.

“Our appointed contractor, Montel Civil Engineering Ltd, will be issuing a letter-drop to local residents this week. Advance warning signage is also being placed along the key routes.”

David Collin, the Project Manager, has told us that temporary traffic lights will be in place from 8pm to 6am over the nights of Monday 12th to Wednesday 14th February while they install the traffic management and lane restrictions. Any future use of traffic lights will also be at night

Although the A39 will remain open, there will be a temporary 20mph speed limit and reduced lane widths for the duration of the works. Since the introduction of the 20mph speed limit throughout Wembdon, Wembdon Parish Council have noticed a significant drop in the volume of through traffic the village. Councillors will continue to carefully monitor traffic volumes while the work is taking place.

Plan of Cokerhurst Farm development showing the two new junctions with the A39

Two new junctions will be constructed on the A39: the more westerly will be a signal-controlled 4-way junction which will also provide access to a separate development on the south side of the A39; the more easterly will be a ‘T’ junction with the secondary access to the Cokerhurst Farm development.

Closure of Sandford Hill – 12th February

A Road Closed sign

The section of Sandford Hill between Skimmerton Lane and Sandford Farm Approach will be closed on Monday 12th February 2024. The closure will start at 09:30 and are expected to last until 15:30 at the latest, to allow Openreach to replace a telegraph pole.

Residents in the affected section should still be able to access their properties.

The official notice for the closure states that for for further information you should contact Sunbelt Rentals on 03700 500 792 quoting reference ttro540539N.

Recycling and refuse collections over the holiday period

Somerset Council have told us that for there will be no collections on Christmas Day or Boxing Day. As a result, recycling and refuse collections next week will be two days later than normal. So, for example, collections will be made on Sunday 31st December instead of Friday 29th.

There will also be no collections on New Year’s Day, so collections that week will be one day later, e.g. Saturday 6th January instead of Friday 5th.

Garden waste collections will stop on Monday 25 December for a fortnight and will resume on Monday 8 January.

Recycling Centres will be closed on Christmas Day, Boxing Day and New Year’s Day, but otherwise will be open as usual.

More information (opens in new tab)

Flooding in Wembdon Parish

Road sign: Road closed flood

A number of lanes, around Perry Green in particular, have flooded in the recent severely wet weather. This has caused extreme difficulties for some residents, in getting in and out of their homes, and in some cases there has been flood water entering their properties.

Wembdon Parish Council has raised this issue on many occasions, both with local landowners to encourage better maintenance of drainage ditches, and with Somerset Highways. Unfortunately, progress is very slow. We will continue to raise this issue at every opportunity, and thank all the residents who have given us their feedback on this.

Scenes from Perry Green

Flooding outside The Malt House, Perry Green
Outside The Malt House
Flooding outside Perrycroft, Perry Green
Outside Perrycroft
Flooding outside Nauvoo, Perry Green
Outside Nauvoo
Flooding between Moorhen Equestrian and MacLintocks, Perry Green
Between Moorhen Equestrian and MacLintocks

Wembdon Parish Paper edition 42

Cover of Wembdon Parish Paper edition 42

The November Parish Paper has arrived from the printers, and our volunteers (your Parish Councillors) are out and about delivering them to all households in our Parish. If you haven’t received yours yet, don’t worry – it’s on its way.

If you think you should have a copy, and haven’t received it by the end of November, please contact our clerk with your name, address and phone number, and he will sort it out for you.

As usual, there will be some spare copies available at Wembdon Village Hall, the Parish Centre, the Cottage Inn and Greenway Garage. Or you can read it online.

Changes are coming to waste collections next year

Somerset Council's logo

Somerset Council have announced that recycling and rubbish collection days will be changing for more than 120,000 homes in Somerset in February next year. The changes come as new collection routes are introduced by Somerset Council’s contractor, SUEZ Recycling and Recovery UK. The new routes will make rounds more efficient, more manageable for crews whilst reducing mileage and carbon emissions. The changes come at no cost to the council.

In February 2024, recycling and rubbish collection day schedules will change for around 85% of homes in the west of the county, covering the former Sedgemoor and Somerset West and Taunton areas, as well as a small part of South Somerset.

Anyone with a change to their collection day schedule will be written to twice before anything changes, first with a letter in January. Roughly, three weeks after the letter arrives, residents will receive a service guide which includes a collection day calendar for the next 18 months.

It is important that residents know their new collection days – crews will not be able to come back for either recycling or refuse if you miss your new collection day. Because some towns and villages will be covered by more than one route, days may change for some households but not others.

Residents may have:

    • a change to collection day
    • a change in week that their rubbish is collected
    • a change in week that their rubbish is collected

    There will be no changes to:

    • collection days for garden waste subscribers
    • clinical waste collections
    • communal property collections with shared collections (such as blocks of flats, houses of multiple occupancy and retirement developments)
    • schools waste collections

    Changes to routes and collection days for the rest of the county – in the former Mendip and South Somerset areas – are expected to be introduced in June 2024.

    In a Press Release this week, Councillor Dixie Darch, Executive Lead Member for Climate and Environment said: “We’re writing to every household that will have a change to their collection day. Please keep an eye out for your letter in the New Year. If you don’t receive a letter this means that your day is staying the same.

    “The changes will make the collections more efficient and help us to reduce carbon emissions.

    “Please make a note of your new collection day and possible interim rubbish collection. Crews can’t return for missed collections where bins are not out on the right day.”

    Further information can be found online at somerset.gov.uk/waste

    Waldrons Lane closed for emergency repairs

    A Road Closed sign

    We have just been told that Waldrons Lane has been closed with immediate effect because it is a state of disrepair. The closure will last for a maximum of 21 days, unless renewed. Milestone Infrastructure will be carrying out structural maintenance and safety repair works, and will liaise with affected landowners regarding access arrangements.

    The official notice for the closure states that for for further information you should contact Somerset Highways on 0300 123 2224 quoting reference ttro601367N.

    Flooding in Perry Green – 2nd November

    Road sign: Road closed flood

    Perry Green Lane and Waldrons Lane (from Sandford Hill turning to Perry Green) are flooded this morning and it looks like it will take sometime to subside.

    Somerset Council say “Heavy rain and flooding present a danger to drivers – road users are urged NOT to attempt to drive across flooded roads as it’s impossible to estimate the depth of the water reliably.
    “It’s vital to prepare for wet conditions. Motorists are urged to drive with extreme caution. If caught in floods, information and advice is available on the Somerset Road Safety’s Adverse weather conditions webpage.”